219 Terry

  • Location
  • Seattle, WA
  • Project Team
  • Owner
    Alexandria Real Estate Equities
  • Architect
    Stock & Associates, Inc.
  • GC
    BNBuilders, Inc.
  • Mechanical
    PSF Mechanical, Inc.
  • Tenants
    Kineta, Integrated Diagnostics, Nativis

The projects at 219 Terry, a 41,261 sq. ft. 4-story life sciences facility, included new construction shell & core, full-building tenant improvements and a complete remodel of the existing building. A fully-integrated project delivery BIM approach was employed on these projects from design through engineering and construction. A safe laboratory environment was achieved by following stringent environmental design guidelines and clean-build protocol during construction. Major challenges included existing floor-to-floor height constraints and a highly-compressed schedule due to a delayed construction start and tenant occupation schedule.

 

Awarded LEED® Gold